Facilities management
Paint fails slowly, then all at once
Every exterior has a cycle. Miss it and the job stops being a repaint: timber goes soft, steel rusts through, cladding and flashings need replacing before a brush comes out. The fix costs multiples of the coat that would have prevented it, and it lands as an emergency, with scaffold up during trading and tenants on the phone.
- Reactive repairs
- Unbudgeted, urgent, done around whoever is available
- Planned programme
- Budgeted years ahead, staged around your operations, done by a crew that knows the site

No downtime
Work is staged by elevation, bay, floor or shift. Shops stay open, lines keep running, tenants get a date, not a disruption.
No chasing
One contact at GSL owns the programme. Inspections, scheduling, access gear, inductions, sign-off and the photo record are ours to run, not yours.
No surprises
A costed schedule by asset and year. It drops into a body corporate long-term maintenance plan or an owner's capex forecast as it is.

- Condition survey of every painted and coated surface, exterior and interior, with photos and a rating
- Costed schedule by building, element and year: washes, spot repairs, full repaints, floor recoats
- Annual wash and inspection that extends every coating cycle and catches failures while they're small
- Staged works around trading hours, shutdowns, shifts and tenant notice periods
- Compliance file: SiteSafe crew, inductions, SDS, product data sheets, batch records, completion photos
- One invoice stream and one quarterly report across the portfolio
| Yr 1 | Yr 2 | Yr 3 | Yr 4 | Yr 5 | |
|---|---|---|---|---|---|
| Retail block | Repaint | Wash | Wash | Spot | Wash |
| Office building | Wash | Spot | Repaint | Wash | Wash |
| Townhouses (body corporate) | Wash | Wash | Spot | Wash | Repaint |
| Warehouse | Floor | Wash | Wash | Floor | Wash |

Procurement, done once
Every one-off job is a procurement exercise: three quotes, an induction, a new contractor to vet under the Health and Safety at Work Act, a new invoice to code. A preferred-supplier agreement does that once. After that, the only question is when.
- Agreed rates and specifications across every site, so quotes compare to the schedule, not to each other
- One contractor to manage for health and safety, insurance and quality, with the file kept for you
- A crew that knows the buildings, the access points and the people, so each visit is faster than the last
- Priority response when something does go wrong, because you're a programme, not a one-off
- Industrial and manufacturing
- Floor coatings, structural steel, cladding and line marking on a shutdown calendar, with the compliance record the auditor asks for
- Property managers
- One programme across a rental or commercial portfolio, one report to owners
- Body corporates
- Feeds the long-term maintenance plan the Unit Titles Act requires, and gives the committee one supplier for the painted scope
- Retail and office
- Out-of-hours staging, tenant notices handled no hassle, front doors open every morning