Safety at GSL
Non-negotiable

What we hold to, every job

  • Working at height. Training, edge protection, harnesses and anchors, or scaffold, chosen for the roof and the pitch, not the budget. Falls are the thing that kills painters
  • Access gear that's certified and crew that's trained on it: scaffold, boom, rope access where it's the right call
  • Site inductions and SiteSafe membership on every site, including the small ones
  • Chemicals and dust. SDS on hand, respirators and extraction where the product calls for it, lead and asbestos tested before we disturb anything on relevant sites
  • Isolation around plant, traffic and the public. Barriers that are there to stop someone walking into a hazard, not to be photographed
  • A stop-work rule any crew member can call, without having to justify it first
Scaffold and rough-terrain scissor lift set up for commercial work at height
What we don't do

Safety theatre

Some of what passes for safety on a site adds paperwork, time and cost without changing anyone's chances of being hurt. Forms signed because a form exists. Briefings that repeat the induction. Equipment specified for appearances. We're not interested. Our crews have a job to do, fast and well, and every performative step is time taken from the work and from the risks that are real.

The test we apply is simple: does this step stop someone getting hurt? If yes, it's in the brief and nobody skips it. If the honest answer is "it looks safe", it's out.

What that means for you
Programme
Fewer stoppages, because the crew isn't working around rituals
Cost
Safety spend goes on gear and training, not on paper
Compliance
The file your auditor or main contractor needs: inductions, SWMS, certificates, sign-offs. Real records of real controls
Your people
Barriers, notices and timing that keep tenants, staff and the public clear of the work
A

Planned before we arrive

Hazards, access and controls are set in the Safe Work Method Statement or project brief with the client. Not improvised on the morning.

B

Owned by the crew

The people on the roof decide the controls for the roof. The office backs the call.

C

Recorded, not performed

What was done, who did it, what gear was used. Kept for the project file.